November 29, 2026 Politics · worldwide · 24/7
BrookNews Politics, without the noise
LIVE
ICJ Rules Myanmar Military Committed Genocide Against Rohingya Chinese teachers face rising parental pressure over personal life choices Ukraine Restricts Media Coverage of Infrastructure Damage Amid Russian Strikes Beijing Reaffirms Reunification Stance Following Taiwan Local Election Results US Air Force Repels Unauthorized Drone Incursion at RAF Lakenheath India Government Proposes 50% Increase in Parliamentary Seats and Women's Reservation India’s ruling alliance nears two-thirds majority for sweeping parliamentary expansion and delimitation bills Malaysia to Display Artworks Recovered in 1MDB Corruption Scandal Malaysian PM Anwar Vows Prosecution for Military Drug Trafficking KMT Faces Strategic Uncertainty Following Mixed Results in Taiwan Local Elections Gyeongju Authorities Respond to Hillside Wildfire Emergency United States Re-engages Military-Led Sahel Nations to Counter Russian Influence ICJ Rules Myanmar Military Committed Genocide Against Rohingya Chinese teachers face rising parental pressure over personal life choices Ukraine Restricts Media Coverage of Infrastructure Damage Amid Russian Strikes Beijing Reaffirms Reunification Stance Following Taiwan Local Election Results US Air Force Repels Unauthorized Drone Incursion at RAF Lakenheath India Government Proposes 50% Increase in Parliamentary Seats and Women's Reservation India’s ruling alliance nears two-thirds majority for sweeping parliamentary expansion and delimitation bills Malaysia to Display Artworks Recovered in 1MDB Corruption Scandal Malaysian PM Anwar Vows Prosecution for Military Drug Trafficking KMT Faces Strategic Uncertainty Following Mixed Results in Taiwan Local Elections Gyeongju Authorities Respond to Hillside Wildfire Emergency United States Re-engages Military-Led Sahel Nations to Counter Russian Influence

Pakistan Suspends Tarbela Dam Extension Project After Tunnel Flooding

⚖️ Law & Policy 2 min read 👁 16

Construction on the Tarbela 5th Extension Hydropower Project has been halted indefinitely following a protective bund breach that flooded Tunnel Five. Authorities have launched a high-level investigation into the incident, which resulted in no casualties.

Pakistan Suspends Tarbela Dam Extension Project After Tunnel Flooding⚖️Law & Policy

Photo: Tribune Pakistan

Key points

  • Construction at Tarbela Tunnel Five suspended indefinitely after protective bund breach.
  • No casualties reported following the evacuation of all workers from the site.
  • Project faces further delays, pushing completion beyond the revised September 2027 deadline.

Construction work on the Tarbela 5th Extension Hydropower Project has been suspended indefinitely after a protective bund failed on Monday, causing a significant volume of water to inundate Tunnel Five. Haripur Deputy Commissioner Waseem Ahmed confirmed that all personnel, including foreign and local workers, were safely evacuated from the site. While one worker was swept into the water during the breach, emergency teams successfully rescued the individual, and no fatalities have been reported.

The incident has triggered a high-level inquiry to determine whether the structural failure resulted from technical faults or inherent weaknesses in the bund's construction. Officials stated that future operations at the site will remain on hold until the investigation concludes and a formal report is submitted. This project, which aims to add 1,530 megawatts to the national grid, has already experienced multiple delays, pushing its expected completion date to September 2027.

The $807 million initiative is backed by significant international financing, including $390 million from the World Bank and $300 million from the Asian Infrastructure Investment Bank. The civil works contract was awarded to the Power Construction Corporation of China Limited in 2021. The project has previously struggled with regulatory hurdles and environmental challenges, including a temporary work stoppage in August 2025 due to rising reservoir levels.

The stakes

The indefinite suspension threatens Pakistan's long-term energy security goals and risks further straining relations with international lenders. If the project faces prolonged delays or cost overruns, the government may struggle to meet its planned capacity expansion targets, while the loss of potential electricity generation could exacerbate the country's ongoing energy deficit.

Two readings

  • Supporters of the project argue that the suspension is a necessary safety precaution and that the investigation will provide the transparency needed to ensure the structural integrity of the dam's long-term infrastructure.
  • Critics contend that the recurring delays and technical failures highlight systemic mismanagement and poor planning, suggesting that the project's timeline and oversight are fundamentally flawed.

Source Tribune Pakistan — tribune.com.pk/story/2639423/tarbela-t-5-project-work-suspended-indefin… ↗

Contact the newsroom

Got a tip, a proposal or a partnership question? Write to us and we will reply shortly.